Skip to main content

In this section , you will understanding the terminology acronym , definition

  1. On the spec sheet you will see 4 options :   
  2. "F" for Full span 
  3. "C" for Cut to Cut 
  4. "O" for Outer to cut
  5. "H" for Hole to Hole
  6. see the picture 

    image.png

  7. On conventional drilling the "O" and "C" can be use if you select to put a round sleeve into the thumb hole. 
  8. Based on finger tip drilling we determined the  "F" full span 1st see exemple on the picture:

    image.png

  9. The "C" Cut to cut is the measurement from the edge of the thumb to the edge of hole the fingers. By definition is the full span distance - the thickness of the inserts ( if he use inserts on finger tip drilling ) . If not use inserts then the full span is the same as the cut to cut span .let see the exemple of picture
  10. No Inserts exemple :

    image.png

  11. If he use inserts you can select the kind of inserts determined by clicking the "Inserts" section see the picture below : image.png

    image.png

    When the selection of the type of inserts is maded that will give automatically the size of the bit ( O.D ) see on the "O.D" section and receive automatically calculated the "C" ( Cut to Cut ) span .EX:

    image.png

  12. The "O" Outer to Cut section is measured manually when the ball is completely drilled . This is for bowler use thumb switch grip. The Measurement should be shorter than your "C" ( Cut to Cut ) Span .
  13. Select the type of swicth grip use on "Thumb Insert Type" section  

    image.png

  14. The option of switch grip are : Turbo Switch Grip , JOPO Interchangeable or Vise-IT . EX: 

    image.png

    image.png

  15. JOPO Interchangeable and Turbo Switch Grip allow you to use only 1 1/2  drill bit to punch the hole see the picture below . You will find on "O.D" section of the thumb .

    image.png

    image.png

    image.png

  16. If you  use Vise-IT system four drills bit is available see the picture below 

    image.png

    image.png

  17. The "O" (Outer to Cut) measurement is the distance from the edge of the outer sleeve ( Turbo or JOPO) or top sleeve ( Vise-it System) to the edge of the hole of fingers see the exemple below ..

    image.png


  18. The "H" ( Hole to Hole) is the measurement from edge of all hole . It's the shortness distance of the sheet  on this exemple we take the measurement of the "O" span minus the thickness of the outer sleeve ( 1/16)  see ex:

    image.png

  19. The people using side pitch to the thumb you add manually on "Right" of "Left" section based on what is found ex:

    image.png

    image.png

    image.png